e martë, 1 nëntor 2011

Detaje te zhvillimit te Durresit ne periudhen Maj-Tetor 2011 (PJESA4)

PJESA 4

+Ka mbaruar faza e pare e qendres se Durresit, me sistemin e shkalleve te amfiteatrit,xhamise , mureve te kalase, galerine e re te arteve dhe rregullimin e fasadave te Prefektures, Pallatit te Kultures

-Ne fazen tjeter eshte parashikuar heqja e shatervanit nga qendra (qe daton rreth viteve 30 me strukture tipike klasike) dhe ne fakt ka kohe qe shatervani nuk eshte vene me ne pune

Pallati i Kultures





Xhamia





Siper galerise se re te arteve











Shatervani



Bashkia dhe stacioni i bicikletave "Ecovolis"







Ne sfond xhamija



Muret e kalase





Bulevardi







Shkallet e amfiteatrit








Shtepiat qe duhen prishur



Detaje te zhvillimit te Durresit ne periudhen Maj-Tetor 2011 (PJESA3)

PJESA 3

+Stacioni i trenit eshte sistemuar e lyer













Lulishtja ne hyrje te qytetit ka mbaruar ne 90 % punimet, kane ngelur disa gjera te vogla per tu sistemuar (mungojne nja dy shtylla e gjelberimi ne disa pjese te ngritura)




Rrethrrotullimi te stacioni autobuzave ende ska mbaruar





Park publik lojerash per femije i ndertuar kohet e fundit















Detaje te zhvillimit te Durresit ne periudhen Maj-Tetor 2011 (PJESA2)

PJESA 2

Stacioni i ri i autobuzave
Renderi



Punimet



























Sic duket kjo ane e ka te shtruar shtresen e fundit

Detaje te zhvillimit te Durresit ne periudhen Maj-Tetor 2011 (PJESA1)

Duke qene se per vitin 2011 kam update-uar shume pak per qytetet e Shqiperise ne 5 shenimet ne vazhdim po paraqis nje pune te "rene1234" marre nga skyscrapercity per projektet e iniciuara ne kete periudhe per qytetin e Durresit

PJESA 1

Projekti per bulevardin nga lulishtja "Azem Hajdari" deri tek Pallati Kultures
Bulevardi fillon nga lulishtja "Azem Hajdari"



Sic duket ne lulishte jane vendosur shtylla shtese dritash dhe kane riparuar te gjitha pllakat e thyera qe nga vera



Palmat jane krasitur dhe shatervani punon serish









Bulevardi i ri qe po ndertohet duke perfshire dhe fasadimin e ndertesave, ja renderi



Punimet



e mërkurë, 30 mars 2011

The Open Parliament of Albania by Coop Himmelb(l)au





The Open Parliament of Albania by Coop Himmelb(l)au





March 28, 2011



Coop Himmelb(l)au announced that the new "Open Parliament of Albania" in Tirana which incorporates fundamental democratic values such as openness, transparency and public co-determination is officially confirmed. The building, located on a site area with approximately 28,000m2, is going to be the first project in Albania for the Viennese headquartered studio.



"Our design for the new Parliament in Tirana, Albania, stands for the transparency of democracy," commented Wolf D. Prix, Design Principal and CEO of Coop Himmelb(l)au.








Architectural Concept

As the future political center of the Albanian Republic, the Open Parliament of Albania creates an outstanding architectural landmark in one of the main parts of Tirana's urban fabric. Situated along the compositional axis of the city, it is located in vicinity to the major governmental institutions.



The design for the Open Parliament of Albania relies on three main ideas:



- To provide a strong urban statement in this exposed part of Tirana's urban fabric;

- To assemble the different functions in one building ensemble that is compact enough to create a public forum and a park on the southern part of the site;

- To create a unique building for the most important public institution of the Albanian Republic with a contemporary architectural approach shaped to optimize active and passive energy use.








The design incorporates fundamental democratic values such as openness, transparency and public co-determination. The simultaneity of competing political concepts within a democratic society is translated into the design concept: Different building elements are not opposed, but coexist in one building ensemble with a contemporary aesthetic that allows visualizing new functions and meanings.



The core of the building complex is the parliamentary hall that is situated in a glazed cone and stands for the transparency of the legislation.







A public stair leads from the public forum to the landscaped roof of the plinth building that unites all the different building elements of our design: Office block, entrance structure and parliamentary hall. From the plinth the public is able to look into the parliamentary hall even from the outside.



The main entrance is designed as a massive cone, which creates an impressive space and acts as the counterpart to the glazed parliamentary hall.








Energy Concept

The new parliamentary building for the Republic of Albania is designed to capture the natural resources and energy flows of its surroundings and employ them to provide optimal environmental conditions for its occupants. The special configuration of the building form and the optimization of the building envelope together with the use of renewable energy sources ensure an energy efficient design and reduce reliance on fossil fuel energy sources.



The office building is covered with a second skin made of perforated steel that is specially configured to improve building performance related to optimum daylight use, views, solar control, glare protection, thermal insulation, natural ventilation and noise protection.